Geplaatst op: 6 September 2020

On 1 September, the new fire station at Rotterdam The Hague Airport were festively and spectacularly opened. This assignment has now officially been completed! We are proud of the end result !!

Curious about the spectacular opening? Click here for the video.

Geplaatst op: 23 July 2020

Soon and we will also enjoy a well-deserved summer vacation. A time for reflection that we like to use it useful. Because the most beautiful ideas arise when you are relaxed!

Pelecon is growing, our knowledge is growing and with it our ambition. What ambitions are we going to achieve in the second half of this year? The first orders for our new brand Greenhouse Design are now a fact, how can we use our services for greenhouse builders even more efficiently? And how can we put our BetonblockDesign brand on the market even more strongly?

We wish you a very nice summer, rest well and then we may see each other again in September!

PLEASE NOTE: Due to the summer holidays, our office is closed from August 1 to August 16.

Geplaatst op: 20 July 2020

Heembouw realized a new location for Snoeks Automotive in Nieuw-Vennep. Snoeks Automotive is the world’s leading partner for car manufacturers to expand the product range by providing innovative modification concepts that further enhance the utility and market opportunities of vans. The new building in Nieuw-Vennep is a test center and head office.

Pelecon was the main structural engineer for this project and, together with Heembouw Architecten, designed and elaborated the building.

Geplaatst op: 15 July 2020

The National Steel Prize is awarded twice a year to the best project – new construction, renovation or renovation – in the Netherlands or abroad, which is carried out entirely or partly in steel. In the Industrial Construction category, Pelecon has been nominated for the Rhenus New Logic III project in Tilburg.

CONTROL
We have developed this special project together with partners Heembouw Architecten and Reijrink Staalconstructie. Pelecon partner, Mack Stolwijk explains: “In the design phase, we worked with DOKVAST and Habeon. We also managed the options. Structurally, we looked for the limits of the column spacings in combination with the storey floors. To bridge the span of 18 meters, we provide the floors with heavy HL beams. Another challenge was the oval roof construction at the front with the large overhang. ”

TECHNICAL DESIGN
After the DO phase, Pelecon elaborated the technical design in 3D. The working drawings of the foundation also come from the engineering company. Mack continues: “During the BIM sessions, we transfer the model to the suppliers. They can then put their own products in the 3D model and work from there. ”

(NA) CHECKS
As a director, Pelecon checks whether the parties involved deliver what has been agreed in advance. “We also carry out follow-up checks at work,” says Mack. “In doing so, we check, insofar as visible, whether the steel construction is mounted as shown in the drawing.” Pelecon has already carried out one follow-up check.

Click here for more photos and project specifications.

Geplaatst op: 1 July 2020

As of 1 July 2020, we officially continued the work of Konstruktie- en Adviesburo Verheijdt. With this continuation, we are no longer only committed to calculating small and (very) large steel structures (Pelecon) and constructively calculating custom-stacked concrete blocks (BetonblockDesign). Calculation of greenhouse structures is now also coming here.

With Greenhouse Design, an international consultancy, we make structural calculations for high-quality greenhouse systems for growing vegetables, fruit, trees and plants. We work with an experienced team of constructors for a large number of national and international greenhouse builders.

Curious? Read all about our new brand at www.greenhousedesign.nl

A bold building with an constructive challenge

Geplaatst op: 1 July 2020

Together with Mies Architectuur, Pelecon was involved as a constructor in the development of the new municipal yard for Papendrecht from the sketching phase. A great job for a functional, sustainable yet sturdy building!

The building recedes at the top to the rear, giving space to the street profile and providing shade on the south side. The roof is filled with PV panels that, in addition to the natural electricity supply, also have an overcapacity for other functions of the municipality. The glass personnel facility symbolizes a transparent organization with people that you can be proud of. The people who take care of the public space, landscaping and combating smoothness of the Municipality of Papendrecht!

Subscribe to our newsletter and don’t miss anything

Geplaatst op: 25 June 2020

Every month we send all our relations our latest news about the projects that are under development and that have already been completed. But also news from our company Pelecon. Have you already subscribed to our newsletter?

Why exactly this call now? Because we have very good news on 1 July, we will publish it via our newsletter. Do you want to be the first to hear? Register quickly via www.pelecon.nl

Pelecon participates in new headquaters for NVM

Geplaatst op: 25 June 2020

The Nederlandse Vereniging van Makelaars, also known as NVM, signed an agreement for the design and realization of their new headquarters at Papendorp in Utrecht. The beautiful and extremely sustainable design is by Heembouw Architecten and is being built by Heembouw Kantoren.

As a strategic partner, Pelecon has been involved in the design of the new headquarters from the sketching phase. We have designed the construction from the foundation to the roof and we have worked closely with the architect and contractor for this.

Our compliments go to Vivian Wijburg, from Heembouw Architecten she is responsible for the very beautiful design.

Project GMLP on Schilhol is under construction, already delivered

Geplaatst op: 18 June 2020

Four warehouses are being built at Schiphol-Zuidoost, close to the Aalsmeerbaan, on behalf of Borghese Logistics. This means that a total of ± 100,000 m2 warehouse will be realized with 9,000 m2 optional mezzanine and ± 100 docks.

The four buildings were designed constructively by Pelecon and all four have an almost identical constructional design. A steel construction with two-way roof trusses, with a portal system designed in the facade. Each Warehouse can again be divided into several units. The warehouse units are suitable for storage by means of racks with a stack height of 12.2 m.

Warehouse one was completed in 2017, warehouse two in 2019 and warhouse three and four are now under construction.
Mies Architectuur is the architect of this project and Pleijsier Bouw is the contractor.

Photo Credits: Marc Maurer

Unique building for City Cinema in Roosendaal under construction

Geplaatst op: 16 June 2020

A new City Cinema is being built in the center of Roosendaal for C-Cinemas. This film temple contains six screens of different sizes. Three rooms are located on the first floor level, partly above the outside area and partly above the grand café and kitchen. Two penthouses with roof terrace will be realized on the complex. For the energy supplies, the roofs are used to install solar panels.

The building is constructed from a hollow wall system in combination with hollow core slabs. Where walls could not be used, a steel construction has been designed. That’s exactly where Pelecon can make a difference. Together with Mies Architectuur we made the plan drawings and a model for the overall construction.

Even now that construction is still in full swing, we are involved with the Pelecon constructors in the correct execution of the supplier’s parts. This unique building on the Nieuwstraat will be completed this year.