Bol.com’s new distribution centre in Waalwijk was completed in July, currently the (mechanical) fit-out is being finalised after which the first packages are expected to roll off the conveyor belt in 2021. Pelecon was involved early on by architecture and engineering firm DENC in designing a suitable structural design for the automated systems and to select the high-rise racking. “Based on this structural design as well as DENC’s aesthetic design, we advised, calculated and modelled the foundation and steel structure for the new building,” says Pelecon structural engineer Bastiaan Hoefnagel.
Delivered: 2020
Client: Bol.com
Contractor: Bouwbedrijf van de Ven
Architect: Denc Bussum