Royal A-Ware in Lopik; to bite your teeth in

Geplaatst op: 13 February 2023

WE RECENTLY CALCULATED AND DREW FOR A COMPLETELY NEW STOREY FLOOR IN AN EXISTING DISTRIBUTION HALL OF ROYAL A-WARE. THIS CHANGES THE FUNCTION OF THE HALL FROM STORAGE AND TRANSHIPMENT HALL TO A PRODUCTION LOCATION. AN ASSIGNMENT WITH PLENTY OF CONSTRUCTIONAL CHALLENGES FOR PELECON!

These challenges mainly involved determining the column and pile positions within the grid of the existing building. In this type of building, production is always leading for the layout. A real puzzle at times. The new piles are screw injection piles, installed in the limited height. Directly on these piles rest the new story floors with sufficient bearing capacity for machinery and transport.