Construction extension warehouse Ploeger Harderwijk has started

Geplaatst op: 10 September 2021

PLOEGER LOGISTICS EXTENDS ITS WAREHOUSE IN HARDERWIJK FURTHER WITH ANOTHER 11,220 M² GFA. ON THE BELLSTRAAT, THE LOGISTICS SERVICE PROVIDER HAS TO BUILD THESE EXTRA SQUARE METERS TO MEET THE GROWING DEMAND FROM ITS EXISTING AND NEW CLIENTS. AS THE MAIN CONSTRUCTOR, PELECON WORKS ON THIS ASSIGNMENT FROM DESIGN TO EXECUTION.

When construction is finished at the end of 2021, Ploeger will have a hypermodern warehouse. This brings the total capacity at two locations in Harderwijk to more than 55,000 pallet places. Just like the existing warehouses of Ploeger Logistics, this new warehouse is energy neutral. Something that completely fits their mission and vision. This extension therefore meets high BREEAM requirements. The entire warehouse will even be the most sustainable in the region!

SUSTAINABILITY AMBITION
Our constructive design naturally takes Ploeger’s sustainability ambitions into account. The roofs are able to support a large number of solar panels and the very economical construction ensures minimal use of materials.

OUR CHALLENGE
A unique challenge for Pelecon was the question of how the foundation could be optimized and how the total logistics building could be built in three phases. The construction of phase 1 was already prepared for the expansions. Looking back on the advice, we are satisfied with the result. We will remain involved in the controlling role until the end of 2021, we strive for an equally satisfied view of the end result.