Our colleague André Verschoor recently wrote a column for the professional magazine Bouwen met Staal. This is about the acceleration of the execution of construction projects. The costs to be saved during the design process. Both put a lot of pressure on a sustainable design. So that’s where the big profit lies; extra attention to the design, calculations, coordination and the intended detailing. Could we also rate engineering services with stars?
Curious? Read the full column.