LC1220 Gouda
Logistical masterpiece with an eye for detail and sustainability

On the outskirts of Gouda, on the De Goudse Poort industrial estate, the impressive LC1220 logistics centre was recently constructed. Pelecon worked on this project on behalf of Heembouw, which was successfully completed in 2025. With a logistics hall of over 23,500 square metres, a mezzanine of 2,385 square metres and an office space of 1,717 square metres, the building is a prime example of smart engineering and future-oriented construction.

The client asked Pelecon to design the steel structure and also to assess third-party components. The emphasis was on creating a solid, efficient and sustainable structure that perfectly matched the architectural design by Heembouw Architects.

Construction challenges
The shape of the façade, with its undulating canopy, required careful coordination between architecture and construction. Fire resistance requirements also influenced the design; the entire block of offices (at the front) presented an additional challenge in terms of ensuring stability and safety. In addition, the prefab cores had to remain stable independently during the temporary construction phase, which made the project even more complex and required smart, constructive solutions.

Naam: Klaudia Wojtasik-Schoo
Functie: Projectconstructeur

CONSTRUCTIVE REFINEMENT IN THE EXECUTION
Although LC1220 basically consists of a standard child and main truss construction, the design has several technical features. At the front, hollow core slabs were used on the first floor, which function as cantilevers. This required a precisely coordinated installation plan, in which the construction sequence and temporary facilities had to be perfectly aligned. Pelecon's structural design ensured that the process ran smoothly and that installation could take place safely and efficiently.

SUSTAINABILITY AS A GUIDING PRINCIPLE
Sustainability was an important starting point in the development of LC1220. The building has been awarded the BREEAM Excellent label, which means it meets the highest sustainability criteria. The sedum roof contributes to biodiversity and a pleasant microclimate. In addition, the structure is prepared for the load of solar panels, so that the building can easily be made more sustainable in the future. This means that LC1220 is not only built for today, but also for future generations.

COLLABORATION AS THE FOUNDATION FOR SUCCESS
The creation of LC1220 Gouda was the result of close collaboration between various parties. In addition to Heembouw and Heembouw Architects, B-invented, Reijrink BV, VBI and Bisoton also worked closely with Pelecon. Thanks to open communication, joint efforts and the technical knowledge of all those involved, a building has been created that excels in both functionality and aesthetics.

A FUTURE-PROOF LOGISTICS CENTRE
LC1220 Gouda proves that efficiency, innovation and sustainability can go hand in hand. For Pelecon, this was a project that combined technical depth, creativity and collaboration. The result is a future-proof logistics centre that not only meets today's requirements, but is also ready for tomorrow's sustainability ambitions.